Sustainability

Sustainability

Sustainability

130

130

130

kWp of installed capacity of our photovoltaic power plants

kWp of installed capacity of our photovoltaic power plants

78834

78834

78834

kWh produced from our photovoltaic power plants annually.

kWh produced from our photovoltaic power plants annually.

We manage the environmental impacts of our activities within the framework of our environmental management system.

We comply with existing legislation without a compromise.
We comply with existing legislation without a compromise.
Our company complies with applicable legal requirements and the requirements of the environmental management system. Our environmental management system for the manufacture, sterilisation and sale of medical devices is certified according to the ISO 14001:2015 standard.
We use modern manufacturing technologies
We use modern manufacturing technologies
In our production, we invest in modern technologies that increase the efficiency and quality of our processes. During their implementation, we also focus on the efficient use of energy and materials.
We have waste management partners
We have waste management partners
We cooperate with specialized partners authorized to handle waste. We sort individual types of waste and hand them over for further management in accordance with applicable legal requirements.
We continuously optimize the consumption of raw materials and resources in production.
We continuously optimize the consumption of raw materials and resources in production.

Our team focuses on the efficient use of raw materials and resources in production, and on preventing unnecessary material losses. We monitor material consumption and look for opportunities to further optimise production processes.

We use renewable energy sources
We use renewable energy sources
On the premises of the Bučovice plant, we operate two photovoltaic power plants with a total installed capacity of 131.2 kWp. We use the electricity generated within our operations, covering part of our own electricity consumption.
We train staff in the field of environmental management
We train staff in the field of environmental management
Our employees undergo training related to environmental management requirements and their work activities, including waste management and the efficient use of resources.

We installed photovoltaic power plants on the roof of our Bučovice facility.

We installed photovoltaic power plants on the roof of our Bučovice facility.

We have installed photovoltaic power plants on the premises of the plant:

PV plant 1 with an installed capacity of 65.6 kWp
PV plant 2 with an installed capacity of 65.6 kWp

We use the electricity generated within the operation of the plant and cover a part of our own electricity consumption with it.
We have installed photovoltaic power plants on the premises of the plant:

PV plant 1 with an installed capacity of 65.6 kWp
PV plant 2 with an installed capacity of 65.6 kWp

We use the electricity generated within the operation of the plant and cover a part of our own electricity consumption with it.